Home | Chinese | English
Standard Test Device
Portable Meter Test systems
Energy meter Terminal
Testing Automation
Simulation Equipment
Electric Transformer
Technology
postdoctoral workstation
Debugging workshop
2013-09-27
Device workshop
Assembly shop
Intelligent detection robot change watt-hour meter calibration model
2013-09-11
State grid plan 3 years investment of 24.38 billion 2015, realizing a complete coverage of electricity
In the electric power reform: state grid "split into five"?
Three CDH electric won the 2012 annual award, director of the zhengzhou city by the open area
Shandong electric power group co., LTD. In 2013 the first batch of material bidding procurement bidding candidate winning bidders list
Shandong electric power group co., LTD. In 2013 the second batch of goods purchase for the winning candidate list
Ningxia electric power company in 2013 the first batch of goods to purchase for the winning candidate list and the reasons of the public
The winning news
Gansu province electric power company in 2013 the second batch of goods the tender GS271302 beforehand the winning of the public
0.01 ac/dc indicating meter calibration device ADR3000 through a comprehensive check and accept
Three CDH electrical won the 2013 best high enterprise honorary title
State grid set board him chairman
Column classification
Postdoctoral