Standard Test Device

Name: SH-GY10 High voltage measurement simulation device

+
  • undefined

Details Introduction


SH-GY10 consists of high-voltage meter cabinet, simulation power cabinet, calculator, control software, modeled on the substation's meter centralized metering mode can be completed training projects include: installing the meter and connecting the power, high-voltage metering simulation, energy meter on-site calibration, reading the meter, rotating the meter.

High voltage meter cabinet

1、Size 800*1000*2260mm, the same as the high-voltage room measurement cabinet.

2, each cabinet can be connected to 1-2 fast meter, simulation of 10kv three-phase three-wire metering mode

3, the internal voltage transformer adopts the simulation of 1:1 transformer, nameplate and appearance according to 10kv/100v design

4, the internal current transformer using simulation 1: 1 transformer, nameplate and appearance in accordance with the 30A/5A design

Simulation power supply cabinet

1、Output voltage:

Output range: 3*57.7/100v

Adjustment range: 0-120% continuously adjustable

Each phase voltage amplitude can be set separately

Voltage symmetry can be set arbitrarily

2、Output current:

Current range: 5A

Adjustment range: 0-120% continuously adjustable

Amplitude of each phase current can be set separately

Each phase current phase can be set separately

3、Phase adjustment: 0.00°-359.99°.

4、Frequency adjustment: 45Hz-65Hz